Skip to content
IADCSafety Alert

Mast Raising Line Failure

Publisher
IADC · International Association of Drilling Contractors
Type
Safety Alert
Reference
IADC Alert 07-03
Date
Themes
Crane and RiggingLifting Operations

Summary

During the rig move, the drilling rig mast was to be raised.

IADC Alert 07-03. Themes: crane and rigging, lifting operations.

Open at IADC

Links open the alert page on iadc.org; no login is needed.

© International Association of Drilling Contractors, all rights reserved; this site indexes titles and links to IADC's own copies and hosts none.

Publisher link checked · working

Related documents